User manual NERO NERONET

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual NERO NERONET. We hope that this NERO NERONET user guide will be useful to you.


NERO NERONET : Download the complete user guide (1722 Ko)

Manual abstract: user guide NERO NERONET

Detailed instructions for use are in the User's Guide.

[. . . ] QuickStart NeroNET Ahead Software AG Information on copyright and trade marks The NeroNET user manual and all its contents are protected by copyright and are the property of Ahead Software AG. This user manual contains materials that are protected by internationally valid copyright laws. This manual may not - in whole or in part - be copied, transmitted or otherwise reproduced without the express written permission of Ahead Software AG. All trade names and trademarks are the property of the respective owners. [. . . ] Find out how you change the password in the 'Changing a user account' section. Quickstart NeroNET Job administration · 33 This area shows Job ID User Copies Status Action Number of the job User name of person who sent the recording job Number of copies to be recorded Recorder status message Possible actions Open the area by clicking on . If necessary, make any changes you want in the 'Action' area. Delete job Add copies Delete copies Pos Deletes the highlighted job following confirmation Increases the number of copies to be recorded Reduces the number of copies to be recorded Increases the priority of the job in the sequence of jobs to be recorded. Exception: job number 2 cannot be given higher priority since it is possible that job 1 is currently being recorded. Reduces the priority of the job in the sequence of jobs to be recorded. Exception: job number 1 cannot be given lower priority since it is possible that it is currently being recorded. Pos 7. 2. 1 Deleting a job If it should become necessary to delete a job that has been sent to the server, a queue administrator can do this at any time. In the 'Action' column, click on the 'Delete job' link and confirm in the window that now opens that in fact the job really is to be deleted. All the other jobs in the queue will then move one place upwards. Quickstart NeroNET Job administration · 34 7. 2. 2 Adding copies Until a job is recorded, is it possible to increase the number of copies to be burned should the user need more copies than first thought. In 'Action', click on the 'Add copies' link and the number of copies to be made (which appears in 'Copies') will increase by one with each click of the mouse. It is not possible to add copies with the first job in the queue. 7. 2. 3 Deleting copies Until a job is actually recorded, is it possible to reduce the number of copies to be burned should the user need fewer copies than first thought. In 'Action', click on the 'Delete copies' link and the number of copies to be made (which appears in 'Copies') will decrease by one with each click of the mouse. 7. 2. 4 Increasing the priority Usually jobs are recorded by NeroNET in the order in which they arrive at the server, in other words, the first jobs to arrive are recorded first. Until a job has been recorded it is possible to increase its priority so that it moves forward in the queue. Quickstart NeroNET Job administration · 35 Open the area by clicking on . In 'Action', click on the 'Pos ' link and the job will move one recording position upward with each mouse click. It is not possible to increase the priority of the first job in the queue since it already has the highest priority. 7. 2. 5 Reducing the priority Usually jobs are recorded by NeroNET in the order in which they arrive at the server, in other words, the first jobs to arrive are recorded first. Until a job has been recorded it is possible to reduce its priority so that it moves downward in the queue. In 'Action', click on the 'Pos ' link and the job will move one recording position back with each mouse click. It is only possible to reduce the priority of the first job in the queue if it has not yet been recorded. Quickstart NeroNET Job administration · 36 7. 3 Users Open this area by clicking on the element. Users without administrator rights can only view their own jobs and only perform such actions as adding copies or deleting jobs. It is not possible to change the job priority by changing the sequence. This area shows Job-ID User Copies Status Action Number of the job The user name of the user currently logged on who sent the recording job Number of copies to be recorded Recorder status message Possible actions 1. Click on , then log in as user and the list showing your own recording jobs will appear. Delete job Add copies Delete copies Deletes the highlighted job following confirmation Increases the number of copies to be recorded Reduces the number of copies to be recorded if this number is greater than one Job administration · 37 Quickstart NeroNET 7. 3. 1 Deleting a job If it should become necessary to delete a job that has been sent to the server, then this is possible right up to when the job has been recorded. In 'Action', Click on the 'Delete job' link and the job will be deleted following confirmation. All your other jobs in the queue will then move one place upwards. 7. 3. 2 Adding copies Until a job is actually recorded, is it possible to increase the number of copies to be burned - should more copies be needed than first thought. In 'Action', click on the 'Add copies' link and the number of copies to be made (which appears in 'Copies') will increase by one with each click of the mouse. 7. 3. 3 Deleting copies Until a job is actually recorded, is it possible to reduce the number of copies to be burned - should fewer copies be needed than first thought. In 'Action', click on the 'Delete Open this area by clicking on copies' link and the number of copies to be made (which appears in 'Copies') will decrease by one with each click of the mouse. Quickstart NeroNET Job administration · 38 8 General information 8. 1 Jobs If there are any rewritable (RW) discs in the recorder of the NeroNET server, their contents will be deleted before recording starts - without any warning being given or request being made. [. . . ] PCM stands for pulse code modulation and involves digitally encoding analog signals. Pre-gap This is also referred to as a pause. In Nero the default pause is set to 2 seconds (Red Book standard). Session CDs are divided into tracks and sessions. A session consists of all the files which are written to the CD in the course of one write process and can consist of one or more tracks. There can be more than one session on a multisession CD. Simulation Simulation corresponds to the burning process in every way, except that the burning process is simulated and that nothing is written on the disc. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE NERO NERONET




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual NERO NERONET will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.