User manual HASE BILBAO

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual HASE BILBAO. We hope that this HASE BILBAO user guide will be useful to you.


HASE BILBAO : Download the complete user guide (1754 Ko)

You may also download the following manuals related to this product:

   HASE BILBAO DATASHEET (293 ko)
   HASE BILBAO DATASHEET (119 ko)

Manual abstract: user guide HASE BILBAO

Detailed instructions for use are in the User's Guide.

[. . . ] This section contains important information on using this technical documentation. Nevertheless, suggestions for improvement and comments regarding any errors are always welcome. Non-compliance with this warning can cause severe injuries, or even death. [. . . ] To prevent adverse effects on health, nobody should stay in the room(s) during this process unless absolutely necessary. Make sure the room is well-ventilated and open the windows and outside doors. If the maximum temperature is not reached during the first heating operation, you may notice an odour for a short period of time the next time the stove is used as well. Pile up any remaining ash and unburned Charcoal into the centre of the combustion chamber. The surface of your stove was treated in a sandblasting machine before applying the colour coating. Despite careful and thorough inspection, there may still be some residual material in the stove body, which can fall out when your stove is being installed. To prevent any damage, please immediately vacuum up these small steel pellets with a vacuum cleaner. The first time a stove is operated, the heat development causes the emission of volatile components from the coating, sealing strips and lubricants, and smoke and odours can occur. At a higher combustion temperature, this one-time process can take between 4 to 5 hours. To achieve this higher combustion temperature, please increase the fuel quantity recommended in Section 7, , , Adding Fuel/ Heating with Nominal Thermal Output", by approximately 25%. The firing up phase should be as short as possible, since higher emissions can occur during this phase. The slider settings described in Table 1 (see figure on the right) are recommendations that were determined under conformance testing conditions, in compliance with the relevant standard. Depending on the weather conditions and the draught capability of your chimney, accordingly adjust the slider positions for your Bilbao to the local conditions. The Bilbao may only be operated when the fire box door is closed; the fire box door may only be opened to add fuel. Never use spirits, petrol, or other flammable fluids to light the stove. More fuel should be added to the fire when the flames from the previous burning off phase have just gone out. [. . . ] 15 a B-VG (Austria), can only be operated when the fire box is closed; more than one device can be connected to the chimney. (A): FSPS-Wa-1536-A The following data applies to the chimney characteristics in accordance with EN 13384-1 / 2: Depending on the insulation of the building, the nominal thermal output of 7 kW indicated on 25 - 95 m² (subject to change) Dimensions: Stove Fire box Height 127 cm 40 cm Width 54, 5 cm 32 cm Depth 49 cm 30 cm Can be stopped in place and locked right/left in 10° gradients. The original Declaration of Conformity and associated documents are available from the manufacturer upon request. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE HASE BILBAO




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual HASE BILBAO will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.